The wrap is done at five. The business starts at six.
- Measuring panels off a spreadsheet.
- Guessing at waste.
- Pricing from last year's number because the real cost is somewhere in a text thread.
- Finding out what a job made three weeks after the car left.
Quote
Price the job. Know what it earns before you send it.
Pick the vehicle and the service. Material comes from the measurement set and your waste percentage. Labor is your hours at your rate. Overhead is allocated the way you set it. The margin is on the screen before the customer sees a number, with a floor you choose.
In the product: Quote editor · vehicle library and measurement sets · waste percent · labor at the shop rate · overhead allocation · target margin and floor
See how it works →2024 Porsche 911 GT3
DraftA. Rivera · Full wrap · Satin black cast film · Q-0142
- Material · 318 sq ft incl. 20% waste × $4.25
- $1,351.50
- Labor · 24.0 h × $40.00
- $960.00
- Allocated overhead · per labor hour
- $400.00
- Fully loaded cost
- $2,711.50
Price · target margin 35.0% fully loaded
$4,170
Contribution, before overhead
$1,858.50 · 45.0%
Est. profit, fully loaded
$1,458.50 · 35.0%
Above the shop’s 30% floor. No reason required.
Send to customerApproval
Send it. They approve it on their phone. It becomes a job.
The quote goes out by email or link. The customer sees the price and the scope, not your costs, and approves online. One click converts it to a job. If it goes cold, the follow-up date is on the quote, and a declined quote says why.
In the product: Send by email or link · public approval page · convert to job · follow-up date · declined with reason
See how it works →Northline Wraps
northline.form001.com/q/…2024 Porsche 911 GT3
Prepared for A. Rivera
Full wrap
Satin black cast film, all painted panels.
$4,170.00
In the bay
Every job has a bay, a date and a crew. Installers see the work, not the money.
An approved job gets a bay, planned dates and installers. A bay holds one car at a time and the system refuses a double booking. Installers open the job on a phone: vehicle, services, bay, three actions. Hours and material are logged as they happen, rework flagged.
In the product: Job plan · bay occupancy check · installer app with no prices · start and finish · log hours · log material · rework flag
See how it works →2024 Porsche 911 GT3
In progressA. Rivera · Full wrap · J-0087 · from Q-0142
Baseline frozen at conversion · $4,170 · 24 h · 318 sq ft
Bay
Bay 2
Planned
Dec 9 – Dec 11
Crew
M. Chen, D. Okafor
My jobs · today
2024 Porsche 911 GT3
Full wrap · Satin black · Bay 2
No prices on this screen, by design.
Earned
Close the job. See what it made, line by line.
Estimate against actual for material, labor and overhead, on the job page when it closes. Reports by service, estimator and installer. Everything exportable as CSV.
In the product: Close dialog with variance · reports by service, estimator and installer · CSV export of every table
See how it works →Close job
2024 Porsche 911 GT3 · A. Rivera · Full wrap · J-0087
Invoiced $4,170.00 · 29.0 h logged · 340 sq ft used
| Figure | Estimated | Actual | Variance |
|---|---|---|---|
| Material · 318 → 340 sq ft | $1,351.50 | $1,445.00 | −$93.50 |
| Labor · 24 → 29 h | $960.00 | $1,160.00 | −$200.00 |
| Overhead · at actual drivers | $400.00 | $483.33 | −$83.33 |
| Revenue · invoiced | $4,170.00 | $4,170.00 | +$0.00 |
| Contribution, before overhead | $1,858.50 · 45.0% | $1,565.00 · 37.5% | −$293.50 |
| Profit, fully loaded | $1,458.50 · 35.0% | $1,081.67 · 25.9% | −$376.83 |
For the owner who does everything
You are the estimator, the installer and the office. Quote like you have one.
A quote in one pass, with the margin shown, so you can say yes on the phone. Follow-ups dated on the quote so nothing goes cold while you are in the bay. The job closed with its real numbers, so next year's price is this year's cost.
- Quoting takes the evening.
- Saying yes without knowing the margin.
- Jobs that drift because the follow-up lives in your head.
2024 Porsche 911 GT3
DraftA. Rivera · Full wrap · Satin black cast film · Q-0142
- Material · 318 sq ft incl. 20% waste × $4.25
- $1,351.50
- Labor · 24.0 h × $40.00
- $960.00
- Allocated overhead · per labor hour
- $400.00
- Fully loaded cost
- $2,711.50
Price · target margin 35.0% fully loaded
$4,170
Contribution, before overhead
$1,858.50 · 45.0%
Est. profit, fully loaded
$1,458.50 · 35.0%
Above the shop’s 30% floor. No reason required.
Send to customerFor the shop with more than one of everyone
One price list. Every estimator prices the same job the same way.
The pricing policy belongs to the shop: method, target margin, floor. Pricing below the floor needs a written reason and it is logged. Every approved job has a bay, dates and a crew, and the system will not double book. Reports show margin by estimator and installer, so you know where it leaks.
- Three estimators, three prices for the same car.
- Bays booked on a whiteboard.
- Margin that leaks somewhere between the quote and the invoice.
Pricing policy
Applies to every estimator
- Method
- Target margin, fully loaded
- Target margin
- 35%
- Floor
- 30%, reason required
- Overhead
- Per labor hour
- Rounding
- $5
Pricing below the floor is logged with who, when and why.
Margin by estimator
Closed jobs · last 90 days · full wraps
| Estimator | Jobs | Est. margin | Actual |
|---|---|---|---|
| R. Alvarez | 14 | 36.1% | 31.4% |
| J. Park | 11 | 35.0% | 34.2% |
| S. Whitfield | 9 | 33.8% | 24.6% |
Illustrative names and figures. Filters by service, estimator and installer.
Price one. Close one.
Try the numbers. They are the real engine.
Set your material, your hourly rate and your target margin. The quote reprices as you move them. Then see what the same job looks like when it closes.
Sample quote
The same job, priced the way your shop prices it.
Change coverage, film or your rates and the numbers re-solve with the estimating engine the product uses.
Illustrative sample. The roll prices, hours, overhead and rates below are teaching numbers, not any shop's. In the product every one of them is yours to set.
Recommended price
$4,170
Before tax. Rounded to the shop's increment.
Estimated job contribution
$1,859
44.6% of price · estimate, not guaranteed
| Film318 sq ft incl. waste × $4.25 | $1,351.50 |
| Labor24.0 h × $40.00 | $960.00 |
| Overheadmonthly fixed costs spread per labor hour | $400.00 |
| Fully loaded cost | $2,711.50 |
| Margin on fully loaded costtarget 35% | 35.0% |
The pilot
We are in pilot. Here is what that means.
Form001 is in use in a working restyling shop and open to a small number of others. During the pilot the full product is free. Your data is yours, exportable as CSV at any time. Pricing will be published before general availability, and pilot shops will hear it first. In return we ask for honest feedback and a monthly call.
Questions
- Do I need to replace my CRM?
- No. Form001 holds customers, leads and quotes for the shop. HubSpot or whatever you use for marketing stays.
- Does it schedule my bays?
- Jobs carry a bay, planned dates and a crew, and the system refuses a double-booking. There is no calendar view today.
- Where do measurements come from?
- A shared vehicle library plus your own measurement sets. You can add any vehicle you measure yourself.
- Can installers see prices?
- No. Their phone view has none, and that is tested on every release.
- Can I get my data out?
- Yes. Every table as CSV in one zip, whenever you like.
- Taxes and invoicing?
- Quotes are pre-tax. Invoicing is not in the product today; deposits can be recorded against a job.
Set your rates, price one job, see what it earns.
Free during the pilot. Your data is yours to export at any time.